Feed-in tariff FIT
Our society is heavily dependent on fossil fuels such as oil, gas and coal, and is likely to remain dependent on them for much of this century. Every year we emit more than 20 billion tonnes of carbon into the atmosphere by burning fossil fuels, half of which is absorbed in the seas and by vegetation, and half of which remains in the atmosphere.
The impact on human and natural systems is potentially irreparable. In addition, as fuels deplete and demand increases, so supplies become more vulnerable to disruption.
The feed-in tariff scheme was introduced by the Government's Department for Energy and Climate Change (DECC) on 1 April 2010. Consumers who generate their own electricity from a renewable or low-carbon source can qualify for a payment (‘Feed-in Tariff’ (FIT)) for each unit of electricity generated.
Allowable technologies are:
- Solar photovoltaic panels.
- Wind turbines.
- Water turbines.
- Anaerobic digestion (biogas energy).
- Micro combined heat and power (micro-CHP).
The installation must have a peak output of no more than 5 megawatts (MW) and must be installed by a certified installer.
The feed-in tariff rate varies depending on:
- The size of the system.
- The generating technology.
- The installation date.
Consumers can also qualify for an ‘export tariff’ by selling surplus electricity back to their supplier. This is estimated as being 50% of the electricity generated for most domestic systems.
The tariffs paid depend on the eligibility date, and for solar photovoltaic panels, if the property’s energy performance certificate (EPC) rating is below ‘D’, then either additional energy saving measures must be taken before solar photovoltaic panels are installed, or a lower tariff will be paid.
Tables showing the latest tariffs are available on the Ofgem website.
NB: On 9 September 2015, following consultation, the government announced that they would remove pre-accreditation for all new participants in the Feed-in Tariff scheme from 01 October. Pre-accreditation allows a developer to lock in the subsidy rate well before major construction work or installation to acquire the necessary planning and environmental permits and grid connections has been completed.
This means that although the subsidy level may have reduced by the time electricity begins to be generated, the developer will receive the higher subsidy agreed when the plant was in the planning stage. Ref gov.uk.
NB: On 31 March 2019, the United Kingdom's Feed-in tariff was discontinued for new applicants. See Smart Export Guarantee SEG.
[edit] Related articles on Designing Buildings
- CHP.
- Domestic micro-generation.
- Electricity supply.
- Energy performance certificates.
- Energy storage - the missing piece?
- Geothermal piles.
- Green deal.
- Green Deal Home Improvement Fund.
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration.
- Microgeneration certification scheme.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Micro-grid.
- On site.
- Private wire arrangement.
- PV inverter.
- Renewable energy.
- Renewable heat incentive.
- Smart Export Guarantee SEG.
- Solar photovoltaics
- Solar thermal systems.
- Wind Energy in the United Kingdom
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.